Metso has been awarded an order valued at over €10 million ($11.84 million) for multiple Vertimill® 4500 grinding mills for a Direct Reduction (DR) grade iron ore project.
The Vertimill grinding mills offer significant advantages for iron ore projects, Metso says, with the vertical design helping minimise energy consumption and operational costs, while also delivering consistent particle size distribution. This is essential for producing high-quality pellets for steel production.
This Metso Plus technology is an optimal choice for projects focused on sustainability and high-performance processing, the OEM added.
The post Metso banks plus-€10 million Vertimill order for DR grade iron ore project appeared first on International Mining.