Weir secures ‘multimillion-dollar’ contract to supply WARMAN pumps to Xizang copper mine

Weir says it has secured a multimillion-dollar contract with a major Chinese non-ferrous metals company to supply WARMAN® pumps for the Phase III expansion of a Xizang copper mine.

The scope includes two WARMAN MCR® 450 cyclone feed pumps, and nine WARMAN AHPP 20/18 tailings transfer pumps for use in the grinding circuit and tailings facility.

The expansion will increase processing capacity from 19.9 Mt/y to 30 Mt/y, delivering an annual copper output of up to 200,000 t. Weir’s equipment will play a critical role in supporting efficient operations in one of the world’s most challenging mining environments at the country’s second largest copper mine, it says.

The contract was awarded based on Weir’s strong total cost of ownership, underpinned by proven performance, durability and lifecycle value, it says. The decision was further reinforced by endorsement from the China ENFI Engineering Corporation (China Nonferrous Engineering and Research Institute, ENFI) and the customer’s prior positive experience with WARMAN pumps.

Configured to operate effectively at elevations of up to 5,118 m above sea level, WARMAN pumps incorporate advanced wear-resistant technology to maximise uptime, extend service life and reduce maintenance requirements, according to the company. Weir will provide end-to-end lifecycle support spanning commissioning, start up and ongoing operations with their teams of expert engineers.

Jack Wang, Sales Director of Weir China, said: “High-altitude mining environments place significant demands on equipment, particularly in extreme cold and low-oxygen conditions. Our WARMAN pump solution is engineered to perform consistently in these conditions while helping reduce maintenance and lifecycle costs.

“This contract reflects the strong confidence placed in Weir, underpinned by ENFI’s endorsement and the customer’s proven experience with WARMAN pumps. Together with our end-to-end lifecycle support – from design and manufacturing through to installation, commissioning and ongoing operations – we are helping ensure reliable, cost-efficient and stable performance over the life of this project.”

The post Weir secures ‘multimillion-dollar’ contract to supply WARMAN pumps to Xizang copper mine appeared first on International Mining.

Source link